REALIGNMENT OF TAX LOGISTICS ALONG THE ENTIRE VALUE CREATION


Challenge

Inventory-driven production, a lack of coordination between manufacturing, planning, and the supply chain, as well as high capital commitment, led to long lead times and increasing margin pressure.

Intervention

  • Conversion to line production with clearly defined material flows.
  • Implementation of a demand-driven control logic and synchronization of the entire value chain.
  • Clear responsibilities and transparent key performance indicators (KPIs) throughout the process.

Result:

STOCK


reduced by
around 50%

DURATION


reduced from up to 20 weeks
to 8 weeks (in some cases 6)

STORAGE COSTS


reduced by
at least 10%

MATERIAL AVAILABILITY


limited to
4–6 weeks

Impact: Structural improvement in the quality of results and a sustainable increase in the EBIT margin to the double-digit range.

LET'S TALK

Your next step:
Fill out the form or contact us directly – we will get in touch shortly to arrange a personal consultation.

  • Email
    info@diluc.de
  • Phone number
    Contact Italy: +39 344 50 29 916
    Contact Germany: +49 172 61 91 430
  • Address:
    Via Antonio Gorini 17A | 21023 Besozzo (VA), Italy
    Germany (Baden-Württemberg)
Yes, I have read and accept the privacy policy .