LEAN TRANSFORMATION IN THE ADMINISTRATIVE AREA


Challenge

Purchasing, materials planning, and production planning were operating reactively. High levels of overtime, a lack of prioritization, and inventory-driven production led to inefficiency, unnecessary capital tie-up, and a constant need for coordination between the office and the shop floor.

Intervention

  • Analysis of end-to-end administrative processes.
  • Introduction of clear prioritization logic and a daily board as part of shop-floor management.
  • Implementation of Kanban elements and a shift to demand-oriented procurement with a defined six-week production horizon.

Result:

OVERTIME


reduced by
30–40%

COORDINATION BETWEEN OFFICE AND PRODUCTION


signficantly improved

PRODUCTION
RUNS


significantly accelerated

INVENTORY LEVELS


Reduced through
demand-oriented control

Impact: Administrative areas transformed from reactive support functions into active drivers of value creation—delivering greater transparency, stability, and measurable relief.

LET'S TALK

Your next step:
Fill out the form or contact us directly – we will get in touch shortly to arrange a personal consultation.

  • Email
    info@diluc.de
  • Phone number
    Contact Italy: +39 344 50 29 916
    Contact Germany: +49 172 61 91 430
  • Address:
    Via Antonio Gorini 17A | 21023 Besozzo (VA), Italy
    Germany (Baden-Württemberg)
Yes, I have read and accept the privacy policy .